Studies and Consultations

Pursuant to the Renewable Energy Approval Process, there are a number of required studies and consultations that are to be performed. A list of studies, reports and/or agreements that Penn will typically undertake for a solar PV farm is as follows:

  • Natural Heritage (Biological) Assessment

  • Species at Risk Assessment (Flora & Fauna)

  • Archaeological Assessment

  • Cultural Heritage Assessment

  • Acoustic Assessment Report (Noise Study)

  • Geotechnical Investigations

  • Phase I Environmental Study

  • Topographical Survey

  • Project Description Report of the proposed project.

  • Public Consultation Process and Report (regarding consultation with the Public, Aboriginal Communities, Municipalities and other Local Authorities, etc.)

  • Connection Impact Assessment (Hydro Grid)

  • Connection Cost Agreement (Hydro Grid)

  • Design & Operations Report

  • Domestic Content Plan

  • Construction Plan Report